Water Resources Authority

Headquaters

NHIF Building, Wing B, 9th Floor

Water Resources Authority

Headquaters

NHIF Building, Wing B, 9th Floor

Headquaters

NHIF Building, Wing B, 9th Floor

ADDENDUM NO.2 -Mandatory Site Visit Requirements for Bidders- Batch 1 MAR Infrastructure sites under the HoAGW4RP

[featured_image]
  • Version
  • Download 607
  • File Size 2.97 MB
  • File Count 1
  • Create Date March 11, 2026
  • Last Updated March 11, 2026

ADDENDUM NO.2 -Mandatory Site Visit Requirements for Bidders- Batch 1 MAR Infrastructure sites under the HoAGW4RP

Attached Files

FileAction
ADDENDUM NO.2.pdfDownload
Scroll to Top